crwdns2933423:0crwdne2933423:0
crwdns2918538:0crwdne2918538:0

Linear Rail V2/V3 Endstop Install

crwdns2936025:03crwdne2936025:0 —

crwdns2935477:0crwdne2935477:0:

crwdns2935483:0crwdne2935483:0

Use M3x12 BHCS to adjust the endstop position, so the nozzle tip is even with the front edge of the bed when the end stop is triggered

Check the clearance between the motor and the linear adaptor. When the bed is all the way back against the endstop. There should be a 1-2 mm gap when the endstop is triggered.

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0