crwdns2931529:0crwdnd2931529:0crwdnd2931529:0crwdnd2931529:02crwdnd2931529:0crwdne2931529:0
crwdns2935425:01crwdne2935425:0
crwdns2931653:01crwdne2931653:0
-
When you reach the pump cylinder, lift the pipe so that the pump cylinder is just below the base clamp, but is not contacting it.
-
Secure the riser main with the base clamp.
-
Stabilize the pipe by holding it and unbolt the base clamp from the pump base.
-
Lift the riser main, pump cylinder, and base clamp straight up out of the well.
-
Set the cylinder down carefully to prevent damage, preferably on a clean surface.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0