crwdns2931527:0crwdnd2931527:0crwdnd2931527:0crwdnd2931527:0crwdne2931527:0
crwdns2935425:04crwdne2935425:0
crwdns2931653:04crwdne2931653:0
Test the belt switch for continuity
-
Check the continuity between the switch wires while the idler pulley arm is down.
-
Next, test to see that the belt switch shows continuity when the idler pulley arm is raised.
-
The multimeter should read less than 1 Ω.
-
If the switch fails either of these tests, replace it. Go on to the next step.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0