crwdns2933423:0crwdne2933423:0

Linear Rail V2/V3 Endstop Install

crwdns2935425:03crwdne2935425:0

crwdns2936315:0crwdne2936315:0
crwdns2936323:0crwdne2936323:0
crwdns2931653:03crwdne2931653:0
Linear Rail V2/V3 Endstop Install, Setting endstop position: crwdns2935265:00crwdnd2935265:01crwdnd2935265:02crwdne2935265:0 Linear Rail V2/V3 Endstop Install, Setting endstop position: crwdns2935265:00crwdnd2935265:02crwdnd2935265:02crwdne2935265:0
Setting endstop position
  • Use M3x12 BHCS to adjust the endstop position, so the nozzle tip is even with the front edge of the bed when the end stop is triggered

  • Check the clearance between the motor and the linear adaptor. When the bed is all the way back against the endstop. There should be a 1-2 mm gap when the endstop is triggered.

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0