crwdns2935425:03crwdne2935425:0
crwdns2931653:03crwdne2931653:0
Install 1b.
-
After feeding harness A into the control box, note where everything is connected in case you have remove things like the LCD connections to access the new connection points.
-
Plug in the 3 pin connector to D11 row with the red wire on the V pin. For CR-10S machines, it is the pin closest to the LCD connections.
-
Plug in the 2 pin connector where the original Z end stop was plugged in. This is Z- for CR-10S machines.
-
Zip tie harness A to the original harness group for strain relief.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0