crwdns2933423:0crwdne2933423:0
crwdns2918538:0crwdne2918538:0

GE Front Load Washing Machine Disassembly

crwdns2936025:06crwdne2936025:0 —
crwdns2944702:0crwdne2944702:0
crwdns2944706:0crwdne2944706:0

Reconnect the wire harness on the left side behind the bulkhead before positioning it.

Lift the bulkhead above the chassis and lower it onto the plastic mounts.

Align the blower fan part of the door boot with the slots on the bulkhead and secure them.

Reinstall all bulkhead screws, working from the outside edges in toward the center.

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0