crwdns2933423:0crwdne2933423:0
crwdns2918538:0crwdne2918538:0

How to Descale the BES900/BES900XL Breville Dual Boiler

crwdns2936025:01crwdne2936025:0 —

crwdns2935477:0crwdne2935477:0:

crwdns2935483:0crwdne2935483:0

There are 4 screws holding the top of the machine on. Two torx screws in the back, and two philips screws under the front overhang of the machine. Remove these, and then CAREFULLY lift the top off, minding there are wires attached to the top. You should be able to prop the top along the back of the machine and leave it there.

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0