crwdns2933423:0crwdne2933423:0
crwdns2918538:0crwdne2918538:0

GI Node Installation Guide

crwdns2936025:02crwdne2936025:0 —

crwdns2935477:0crwdne2935477:0:

crwdns2935483:0crwdne2935483:0

At the selected location, use a post hole digger to make a hole for the node.

Take your time so as to not disturb the soil too much.

Use a tape measure to make sure the hole is 3 feet deep.

The soil removed from the hole will fill roughly 2 buckets

Fill the first bucket with topsoil

When the soil begins to look like clay, switch to filling the second bucket

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0