crwdns2933423:0crwdne2933423:0
crwdns2918538:0crwdne2918538:0

GI Node with Pressure Transducer Assembly

crwdns2936025:030crwdne2936025:0 —

crwdns2935477:0crwdne2935477:0:

crwdns2935483:0crwdne2935483:0

Screw the board onto the standoffs

Attach the gps and antennae to the velcro on the walls of the enclosure

Ensure the board is oriented with the modem on the opposite side of sensor

Plug in the terminal block as shown. The silver wire should go to GND, the black data wire should go to P3.2, and the red power wire should go to P3.3

Plug in the solar panel

Plug in the battery

save this step for later if the node isn't immediately going out for testing

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0