crwdns2933423:0crwdne2933423:0
crwdns2918538:0crwdne2918538:0

Pebble 2 (SE) Teardown

crwdns2936025:04crwdne2936025:0 —

crwdns2935477:0crwdne2935477:0:

crwdns2935483:0crwdne2935483:0

After snapping the eccentric rotating mass (ERM) vibration motor out of its housing on the backside of the display, we can begin to lift up the motherboard...

Only to be snagged by some sneaky display cables!

As we deftly maneuver a spudger to unclip the two(two?) display cables from the underside of the motherboard, we realize with great sadness that the battery and the vibration motor are both hanging on by a solder.

With the display cables free, we can lift out the motherboard and her soldered-on freeloaders.

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0