crwdns2933423:0crwdne2933423:0
crwdns2947577:0crwdnd2947577:0crwdne2947577:0

GI Node Installation Guide

crwdns2869540:0crwdne2869540:0: 688

crwdns2959988:0crwdne2959988:0

crwdns2959990:0crwdne2959990:0
1
crwdns2959992:0crwdne2959992:0
11
crwdns2959994:0crwdne2959994:0
47
crwdns2959996:0crwdne2959996:0
688
crwdns2955950:0crwdne2955950:0: 0

crwdns2959998:0crwdne2959998:0

crwdns2960000:0crwdne2960000:0
crwdns2959984:0crwdne2959984:0: 0

crwdns2959956:0crwdne2959956:0

crwdns2959986:0crwdne2959986:0: 0

crwdns2959958:0crwdne2959958:0

crwdns2955944:0crwdne2955944:0: crwdns2931287:015crwdne2931287:0
crwdns2955970:0crwdne2955970:0: crwdns2937801:0crwdne2937801:0
crwdns2944444:0crwdne2944444:0

crwdns2944446:0crwdne2944446:0

GI Node Installation Guide

crwdns2959930:0crwdne2959930:0

crwdns2943213:0crwdne2943213:0

crwdns2943215:0crwdne2943215:0

    1. GI Node Installation Guide, Select install location: crwdns2935265:01crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
      • Locate a spot in the middle of the rain garden where the soil is bear/free from plants.

      • We need to install in the middle of the rain garden to ensure quality data.

      crwdns2952109:0crwdne2952109:0

      crwdns2917038:0crwdne2917038:0

    2. GI Node Installation Guide, Auger hole for node: crwdns2935265:02crwdnd2935265:01crwdnd2935265:02crwdne2935265:0 GI Node Installation Guide, Auger hole for node: crwdns2935265:02crwdnd2935265:02crwdnd2935265:02crwdne2935265:0
      • At the selected location, use a post hole digger to make a hole for the node.

      • Take your time so as to not disturb the soil too much.

      • Use a tape measure to make sure the hole is 3 feet deep.

      • The soil removed from the hole will fill roughly 2 buckets

      • Fill the first bucket with topsoil

      • When the soil begins to look like clay, switch to filling the second bucket

      crwdns2952109:0crwdne2952109:0

      crwdns2917038:0crwdne2917038:0

    3. GI Node Installation Guide, Install GI node: crwdns2935265:03crwdnd2935265:01crwdnd2935265:02crwdne2935265:0 GI Node Installation Guide, Install GI node: crwdns2935265:03crwdnd2935265:02crwdnd2935265:02crwdne2935265:0
      • Set the GI node into the 3 ft hole.

      • Do your best to make sure it is straight in the ground.

      • Pack the topsoil from the first bucket around the node to make sure it is secure in place. You shouldn't need to use any soil from the second bucket

      • If the surrounding plants are too tall, shading the solar panel, use the shears to trim the plants.

      crwdns2952109:0crwdne2952109:0

      crwdns2917038:0crwdne2917038:0

      • Fill out the deployment form on AirTable.

      • Once installed, confirm the GI node is reporting to the internet by going to its designated website.

      crwdns2952109:0crwdne2952109:0

      crwdns2917038:0crwdne2917038:0

crwdns2935217:0crwdne2935217:0

crwdns2935221:0crwdne2935221:0

crwdns2862417:0crwdne2862417:0

crwdns2935293:0crwdne2935293:0

Brooke Mason

crwdns2935283:005/29/19crwdne2935283:0

2.958 crwdns2915208:0crwdne2915208:0

crwdns2935297:017crwdne2935297:0

crwdns2935287:0crwdne2935287:0

Open-Storm crwdns2935289:0Open-Stormcrwdne2935289:0

Community

crwdns2931471:016crwdne2931471:0

crwdns2935297:0276crwdne2935297:0

crwdns2947412:00crwdne2947412:0

crwdns2917038:0crwdne2917038:0

crwdns2936625:0crwdne2936625:0:

crwdns2936751:024crwdne2936751:0 1

crwdns2936753:07crwdne2936753:0 11

crwdns2936753:030crwdne2936753:0 47

crwdns2959996:0crwdne2959996:0 688