crwdns2933423:0crwdne2933423:0

Marco UP Series Elektropumpe zusammenbauen

crwdns2936315:0crwdne2936315:0
crwdns2936319:0crwdne2936319:0
crwdns2931653:08crwdne2931653:0
Marco UP Series Electric Pump Assembly, Fix the nuts: crwdns2935265:00crwdnd2935265:01crwdnd2935265:03crwdne2935265:0 Marco UP Series Electric Pump Assembly, Fix the nuts: crwdns2935265:00crwdnd2935265:02crwdnd2935265:03crwdne2935265:0 Marco UP Series Electric Pump Assembly, Fix the nuts: crwdns2935265:00crwdnd2935265:03crwdnd2935265:03crwdne2935265:0
Fix the nuts
  • First insert the o-rings.

  • Then add the washers.

  • Eventually, close slightly with the nuts.

  • Before screwing firmly the nuts, shake a little the assembly or allow a few kicks with a soft mallet on the back of the pump, to adjust the mechanical parts to each other.

  • If you can, test that the motor rotates freely by connecting it to the power supply right now. This is a useful step to do right now, because if the brushes are not correctly assembled, you'll have to disassembly the pump again e start from step 4.

  • Firmly fix the nuts, but be prepared to untighten them as needed if the pump draws too much current.

Über die Bolzenenden werden zunächst die O-Ringe gelegt.

Dann die Unterlegscheiben.

Provisorisch dann die Muttern handfest aufdrehen.

Bevor sie dann festgezogen werden, sollte man die ganze Einheit etwas schütteln oder leicht mit einem Gummihammer bearbeiten, damit die mechanischen Komponenten sich setzen können.

Wenn möglich solltest du den Motor anschließen, um zu prüfen ob er wirklich dreht. Das solltest du unbedingt jetzt machen, denn falls die Kohlen nicht richtig sitzen sollten, muss die ganze Pumpe wieder auseinandergenommen werden und bei Schritt 4 wieder begonnen werden.

Ziehe die Muttern jetzt ganz fest. Sei aber darauf vorbereitet, sie wieder etwas zu lösen, falls die Pumpe zu viel Strom ziehen sollte.

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0