crwdns2935425:09crwdne2935425:0
-
Go to other end of planer and remove gear box cover. It simply lifts off.
-
Tie drive chains together so everything stays in same location. Remove three retaining rings with a retaining ring plier (easiest and safest way to do it, buy one at your local hardware store).
-
Pull off two sets of chain and sprockets and carefully lay aside.
-
Remove four M5 x 35mm screws with a 4mm allen wrench. Leave the remaining two bolts in place.
-
Using a bearing removal tool, drive the bearing out of its socket. This will drive the bearing out of the other end so stop when both bearings are loose.
-
My turned bearing removal tool. It worked fine.
-
With proper gloves to protect your hands, carefully remove the cutterhead assembly.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0