crwdns2933423:0crwdne2933423:0

Conexión a tierra de un banco de trabajo

crwdns2936315:0crwdne2936315:0
crwdns2936331:0crwdne2936331:0
crwdns2931653:06crwdne2931653:0
Tracing and Fixing of the Earth Socket Cable
  • The cord runs through the inside of the table and the cord is wrapped around the left leg of the table from the inside.

  • The cord is then routed straight to the left rear leg of the table. From the inside, the cord is wrapped around the leg and routed as close to the center of the table as possible.

  • After this self-tapping screw 1 pcs. the contact block is placed first on the head and the contact of the loop is placed under the block.

  • A block with a socket and a self-tapping screw is placed from below under a metal table beam.

  • The table construction is drilled with a self-tapping screw and a block with a socket loop is screwed on.

  • The torque of the screwdriver is set to 10 divisions.

El cable pasa por el interior de la mesa y se enrolla alrededor de la pata izquierda de la mesa desde el interior.

A continuación, el cable se dirige directamente a la pata trasera izquierda de la mesa. Desde el interior, el cable se enrolla alrededor de la pata y se dirige lo más cerca posible del centro de la mesa.

Después de este tornillo autorroscante 1 pieza, el bloque de contacto se coloca primero en la cabeza y el contacto del bucle se coloca debajo del bloque.

Un bloque con un zócalo y un tornillo autorroscante se coloca desde abajo debajo de una viga de mesa de metal.

La construcción de la mesa se perfora con un tornillo autorroscante y se atornilla un bloque con un bucle de zócalo.

El par de torsión del destornillador se establece en 10 divisiones.

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0