crwdns2935425:06crwdne2935425:0
crwdns2931653:06crwdne2931653:0
Installing the New Gauge
-
Thread the new gauge into the floor pump by turning it clockwise in its housing.
-
Thread the gauge until it is snug and the BAR/psi markings are aligned with the pump body.
-
Allow at least 30 minutes for the thread locker to set.
-
Test the pump to its highest rated pressure and listen for leaks. If you can hear leaks from the gauge, tighten it.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0