crwdns2931529:0crwdnd2931529:0crwdnd2931529:0crwdnd2931529:02crwdnd2931529:0crwdne2931529:0
crwdns2935425:09crwdne2935425:0
crwdns2931653:09crwdne2931653:0
-
Tighten the pipe vise, following the same verbal procedure.
-
Repeat the procedure several times:
-
Once everyone is securely holding the pipe, loosen the pipe vise.
-
Lift the pipe.
-
Tighten the pipe vise.
-
Slide the lifting spanners down to a new position.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0