crwdns2933423:0crwdne2933423:0

2. Assembly

crwdns2936315:0crwdne2936315:0
crwdns2936319:0crwdne2936319:0
crwdns2931653:011crwdne2931653:0
2. Assembly, X Axis Alignment: crwdns2935265:00crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
X Axis Alignment
  • Start by tightening the 8x M3x6 socket head screws for the Z MGN sleds making sure they are straight.

  • Tighten the 2x M3x40 socket head cap screws and the M5x8 button head screw into the 2020 extrusion.

  • Snug the 4x M3 button head screws for the lead screw nuts.

  • Spin the lead screws together making sure the X 2020 can travel the full Z length without binding. If everything moves smoothly snug down all the screws.

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0