crwdns2935425:08crwdne2935425:0
crwdns2931653:08crwdne2931653:0

Final Testing
-
Reverse the order of testing:
-
Connect the air proving switch and verify voltage at pins 1 & 4.
-
Connect the transformer and verify 24VAC out when energized and the air proving switch is cold.
-
With everything connected, powered up the unit and watched the indicator come on and go off. I turned on the fan to the air unit and the indicator came back on and very carefully bringing the voltage probe near the HV lines, I got some nice chirping.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0