crwdns2935425:09crwdne2935425:0
crwdns2931653:09crwdne2931653:0
-
Connect the box to the turbine control board (Pl1.J6.CT).
-
Couple the flow rate measurement block (Pl1-260) to the casing and connect the two O2 supply pipes and the piezo solenoid valve.
-
Then, reinsert the assembly into its housing. Put the cone support (Pl1-50) into place. Put the additional cone support (Pl1-220) also into place.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0