GI Node Installation Guide

crwdns2936315:0crwdne2936315:0
crwdns2936323:0crwdne2936323:0
crwdns2931653:02crwdne2931653:0
GI Node Installation Guide, Auger hole for node: crwdns2935265:00crwdnd2935265:01crwdnd2935265:02crwdne2935265:0 GI Node Installation Guide, Auger hole for node: crwdns2935265:00crwdnd2935265:02crwdnd2935265:02crwdne2935265:0
Auger hole for node
  • At the selected location, use a post hole digger to make a hole for the node.

  • Take your time so as to not disturb the soil too much.

  • Use a tape measure to make sure the hole is 3 feet deep.

  • The soil removed from the hole will fill roughly 2 buckets

  • Fill the first bucket with topsoil

  • When the soil begins to look like clay, switch to filling the second bucket

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0