crwdns2935425:06crwdne2935425:0
crwdns2931653:06crwdne2931653:0
Wiring the sensors
-
Locate the Atlas DO sensor
-
Locate the Atlas PT-1000 Temperature Sensor
-
Obtain four 1.5-inch long standoffs and 4 1-inch long standoffs. Screw the standoffs together as shown, to make four 2.5-inch long standoffs
-
Thread the wires of the sensors into the cable gland. Proceed to screw the standoffs into the holes of the enclosure.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0