crwdns2933423:0crwdne2933423:0

GI Node with Pressure Transducer Assembly

crwdns2936315:0crwdne2936315:0
crwdns2936323:0crwdne2936323:0
crwdns2931653:026crwdne2931653:0
GI Node with Pressure Transducer Assembly, Adding Standoffs and Battery to Enclosure: crwdns2935265:00crwdnd2935265:01crwdnd2935265:03crwdne2935265:0 GI Node with Pressure Transducer Assembly, Adding Standoffs and Battery to Enclosure: crwdns2935265:00crwdnd2935265:02crwdnd2935265:03crwdne2935265:0 GI Node with Pressure Transducer Assembly, Adding Standoffs and Battery to Enclosure: crwdns2935265:00crwdnd2935265:03crwdnd2935265:03crwdne2935265:0
Adding Standoffs and Battery to Enclosure
  • Obtain a foam-wrapped battery from the previous step, and 8 standoffs

  • Screw the standoffs together as shown, to make four 3-inch long standoffs

  • Screw the standoffs into the enclosure, then place the battery vertically in-between the standoffs

  • Make sure the sensor wires and desiccant cartridge are secured inside the box.

  • Make sure the battery is positioned so that its wires are on the sensor's side of the enclosure

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0