crwdns2933423:0crwdne2933423:0

GI Node with Pressure Transducer Assembly

crwdns2936315:0crwdne2936315:0
crwdns2936323:0crwdne2936323:0
crwdns2931653:011crwdne2931653:0
GI Node with Pressure Transducer Assembly, Trimming Pressure Transducer: crwdns2935265:00crwdnd2935265:01crwdnd2935265:03crwdne2935265:0 GI Node with Pressure Transducer Assembly, Trimming Pressure Transducer: crwdns2935265:00crwdnd2935265:02crwdnd2935265:03crwdne2935265:0 GI Node with Pressure Transducer Assembly, Trimming Pressure Transducer: crwdns2935265:00crwdnd2935265:03crwdnd2935265:03crwdne2935265:0
Trimming Pressure Transducer
  • If the pressure transducer wire is already prepped, skip ahead to step 14

  • Obtain wire cutters.

  • Obtain the pressure transducer for measuring infiltration.

  • Use coax cable cutters to cut the thick black outer cable at 75 inches from the end of the grey cylinder.

  • Use wire cutters to cut through the inner wires.

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0