crwdns2933423:0crwdne2933423:0

03 | Asamblea del eje Y

crwdns2936315:0crwdne2936315:0
crwdns2936331:0crwdne2936331:0
crwdns2931653:06crwdne2931653:0
03 | Y Axis Assembly: crwdns2935265:00crwdnd2935265:01crwdnd2935265:03crwdne2935265:0 03 | Y Axis Assembly: crwdns2935265:00crwdnd2935265:02crwdnd2935265:03crwdne2935265:0 03 | Y Axis Assembly: crwdns2935265:00crwdnd2935265:03crwdnd2935265:03crwdne2935265:0
  • Insert 2 x M3 Square Nuts in to their places on the Y Motor holder.

  • Use 2 x M3x40 Socket Cap Screws to assembly Y motor support to the motor holder.

  • Mount the motor to the holder with 3x M3x14 Socket Cap Screws

  • Push the GT2 16T pulley to the motor shaft and ensure that one of the tightening screws are landing on the flat surface of the motor shaft, tighten the 2x M2 hex pulley screws to fasten the pulley on the shaft.

  • Y Motor cable should be downwards.

  • Use the supplied Y motor alignment tool to position the motor.

  • Mount the Y Motor holder with a M6x14 Socket Cap Screw.

Inserte 2 tuercas cuadradas M3 en sus lugares en el soporte del motor Y.

Utilice 2 x tornillos de tapa de zócalo M3x40 para ensamblar el soporte del motor Y al soporte del motor.

Monte el motor en el soporte con 3x M3x14 Tornillos de cabeza hueca

Empuje la polea GT2 20T hacia el eje del motor y asegúrese de que uno de los tornillos de apriete esté apoyado en la superficie plana del eje del motor, apriete los 2 tornillos hexagonales de la polea M2 para sujetar la polea en el eje.

Y El cable del motor debe estar hacia abajo.

Utilice la herramienta de alineación del motor Y suministrada para posicionar el motor.

Monte el soporte del motor Y con un tornillo de cabeza hueca M6x14.

[* green] Insert 2 x [http://zaribo.org/screws-nuts/67-zaribo-screw-kit.html|M3 Square Nuts] in to their places on the Y Motor holder.
[* orange] Use 2 x [http://zaribo.org/screws-nuts/67-zaribo-screw-kit.html|M3x40 Socket Cap Screws] to assembly Y motor support to the motor holder.
[* yellow] Mount the motor to the holder with 3x [http://zaribo.org/screws-nuts/67-zaribo-screw-kit.html|M3x14 Socket Cap Screws]
-[* light_blue] Push the GT2 20T pulley to the motor shaft and ensure that one of the tightening screws are landing on the flat surface of the motor shaft, tighten the 2x M2 hex pulley screws to fasten the pulley on the shaft.
+[* light_blue] Push the [https://zaribo.com/other/63-2gt-6mm-belt-timing-pulley-16t-toothed.html|GT2 16T] pulley to the motor shaft and ensure that one of the tightening screws are landing on the flat surface of the motor shaft, tighten the 2x M2 hex pulley screws to fasten the pulley on the shaft.
[* icon_note] Y Motor cable should be downwards.
[* violet] Use the supplied Y motor alignment tool to position the motor.
[* blue] Mount the Y Motor holder with a [http://zaribo.org/screws-nuts/67-zaribo-screw-kit.html|M6x14 Socket Cap Screw.]

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0