crwdns2933423:0crwdne2933423:0

Pebble 2 (SE) Teardown

crwdns2936315:0crwdne2936315:0
crwdns2936323:0crwdne2936323:0
crwdns2931653:04crwdne2931653:0
Pebble 2 (SE) Teardown: crwdns2935265:00crwdnd2935265:01crwdnd2935265:03crwdne2935265:0 Pebble 2 (SE) Teardown: crwdns2935265:00crwdnd2935265:02crwdnd2935265:03crwdne2935265:0 Pebble 2 (SE) Teardown: crwdns2935265:00crwdnd2935265:03crwdnd2935265:03crwdne2935265:0
  • After snapping the eccentric rotating mass (ERM) vibration motor out of its housing on the backside of the display, we can begin to lift up the motherboard...

  • Only to be snagged by some sneaky display cables!

  • As we deftly maneuver a spudger to unclip the two(two?) display cables from the underside of the motherboard, we realize with great sadness that the battery and the vibration motor are both hanging on by a solder.

  • With the display cables free, we can lift out the motherboard and her soldered-on freeloaders.

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2935429:0crwdne2935429:0

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0