crwdns2935425:032crwdne2935425:0
crwdns2931653:032crwdne2931653:0

Reinstall the Cleaner Head
-
Slide the Cleaner Head pivot points back over their pivots.
-
Reinstall the plastic washers (Cleaner Head Pivot Circlips) over the pivots.
-
Reinstall the Bearing Clips onto the pivots and seat the ends back into the recesses for them.
-
Reinstall the Hose Assembly into the base of the duct.
-
Reconnect the flexible hose for the beater bar to the port plate.
-
Reinstall the sole plate that was removed in step 18.
crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0