crwdns2933423:0crwdne2933423:0
crwdns2918538:0crwdne2918538:0

India Mark II Riser Main (Lifting Spanners) Replacement

crwdns2936025:09crwdne2936025:0 —

crwdns2931533:0crwdnd2931533:0crwdnd2931533:0crwdnd2931533:02crwdnd2931533:0crwdne2931533:0

crwdns2935477:0crwdne2935477:0:

crwdns2935483:0crwdne2935483:0

Tighten the pipe vise, following the same verbal procedure.

Repeat the procedure several times:

Once everyone is securely holding the pipe, loosen the pipe vise.

Lift the pipe.

Tighten the pipe vise.

Slide the lifting spanners down to a new position.

crwdns2944171:0crwdnd2944171:0crwdnd2944171:0crwdnd2944171:0crwdne2944171:0