crwdns2933803:05crwdne2933803:0
crwdns2933797:0Joncrwdnd2933797:0crwdne2933797:0
crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 Jon
- crwdns2933769:0crwdne2933769:0
- crwdns2933771:0crwdne2933771:0
- crwdns2933801:0crwdne2933801:0
crwdns2933807:0crwdne2933807:0
[title] Install New LCD Hinge Assembly | |
- | [* black] Look for the metal notches that are located to the side of each metal hinge. |
- | [* black] Slide both corners of the main chromebook chassis under both of these metal notches. |
- | [* black] Push both metal hinges down over the chassis. They should be lined up according to the screw hole pattern located on the chassis. |
+ | [* black] Look for the metal notches that are located to the side of each metal hinge. (see video) |
+ | [* black] Slide both corners of the main chromebook chassis under both of these metal notches. (see video) |
+ | [* black] Push both metal hinges down over the chassis. They should be lined up according to the screw hole pattern located on the chassis. (see video) |
+ | [* black] Replace both the left and right hinge screws. (see video) |
+ | [* black] Look for the arrow icons etched into the hinge metal next to each screw hole. These arrows indicate a screw is required. (Example, there are 3 screw holes on the left hinge but only 2 screws are required) |