[title] Access other end for final cutterhead assembly removal | |
[* black] Go to other end of planer and remove gear box cover. It simply pulls off. | |
[* black] Tie drive chains together so everything stays in same location. Remove three retaining rings with a retaining ring plier (easiest and safest way to do it, buy one at your local hardware store). | |
[* black] Pull off two sets of chain and sprockets and carefully lay aside. | |
[* black] Remove four M5 x 35mm screws with a 4mm allen wrench. Leave the remaining two bolts in place. | |
- | [* black] Using a bearing removal tool, drive the bearing out of its socket. This |
+ | [* black] Using a bearing removal tool, drive the bearing out of its socket. This will drive the bearing out of the other end so stop when both bearings are loose. |
[* black] My turned bearing removal tool. It worked fine. | |
[* black] With proper gloves to protect your hands, carefully remove the cutterhead assembly. |