crwdns2933423:0crwdne2933423:0

crwdns2933803:06crwdne2933803:0

crwdns2933797:0Jeff Suovanencrwdnd2933797:0crwdne2933797:0

crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 Jeff Suovanen

crwdns2933769:0crwdne2933769:0
crwdns2933771:0crwdne2933771:0
crwdns2933801:0crwdne2933801:0

crwdns2933807:0crwdne2933807:0

[title] Installing the New Gauge
[* black] Thread the new gauge into the floor pump by turning it clockwise in its housing.
[* red] Thread the gauge until it is snug and the BAR/psi markings are aligned with the pump body.
[* icon_note] Gauge performance will not be affected by its position, so long as it is snug.
+[* black] Allow at least 30 minutes for the thread locker to set.
+[* black] Test the pump to its highest rated pressure and listen for leaks. If you can hear leaks from the gauge, tighten it.