crwdns2933423:0crwdne2933423:0

crwdns2933803:05crwdne2933803:0

crwdns2933797:0Connorcrwdnd2933797:0crwdne2933797:0

crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 Connor

crwdns2933769:0crwdne2933769:0
crwdns2933771:0crwdne2933771:0
crwdns2933801:0crwdne2933801:0

crwdns2933807:0crwdne2933807:0

[* red] Screw clockwise, the new Teflon wrapped the threaded part of an elbow, into the pipe in the ground.
[* icon_note] This is the location of the old sprinkler head and riser.
-[* yellow] Confirm that the part is installed snugly and not cross- threaded.
+[* yellow] Confirm that the part is installed snugly and not cross-threaded.
[* icon_note] Caution: Do not over tighten.