crwdns2933803:01crwdne2933803:0
crwdns2933797:0PATRICIA ANN FOURNIERcrwdnd2933797:0crwdne2933797:0
crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 PATRICIA ANN FOURNIER
- crwdns2933769:0crwdne2933769:0
- crwdns2933771:0crwdne2933771:0
- crwdns2933801:0crwdne2933801:0
crwdns2933807:0crwdne2933807:0
[* red] First, dig and remove dirt around the existing sprinkler head and several inches around connected PVC. | |
[* orange] Place dirt in 5 gallon the buckets or on the surface near the hole | |
- | [* yellow] Dig till the hole is at least 14 inches below the PVC pipe allowing room for flex riser |
+ | [* yellow] Dig till the hole is at least 14 inches below the PVC pipe allowing room for the flex riser |