crwdns2933423:0crwdne2933423:0

crwdns2933803:05crwdne2933803:0

crwdns2933797:0Sangwon Kimcrwdnd2933797:0crwdne2933797:0

crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 Sangwon Kim

crwdns2933769:0crwdne2933769:0
crwdns2933771:0crwdne2933771:0
crwdns2933801:0crwdne2933801:0

crwdns2933807:0crwdne2933807:0

[* black] Slide the new middle gutter into the top gutter, inserting it gently until they are firmly connected.
[* icon_note] Double-check that the alignment is correct and there are no gaps between the sections.
-[* black] With the middle and the top gutter connected, reattach the assembled gutters to the connected fittings.
-[* black] Position against the wall where it was previously detached from.
+[* black] With the middle and top gutters connected, reattach the assembled gutters to the connected fittings.
+[* black] Ensure the new middle gutter is properly positioned and aligned against the wall