crwdns2933423:0crwdne2933423:0

crwdns2933803:04crwdne2933803:0

crwdns2933797:0Tiny Machines 3Dcrwdnd2933797:0crwdne2933797:0

crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 Tiny Machines 3D

crwdns2933769:0crwdne2933769:0
crwdns2933771:0crwdne2933771:0
crwdns2933801:0crwdne2933801:0

crwdns2933807:0crwdne2933807:0

[title] Top Section 1d./ 2a.
[* icon_note] Pull the expandable loom back towards the daughterboard. This will shorten and expand it, making it easy for the next couple steps
[* light_blue] Pull the original probe out from the opposite side to remove it from the loom.
-[* orange] From the daughterboard side, insert the new probe harness with the small plug going in first. This side plugs into the probe. With the loom still expanded, you should be able to get it completely through to the probe side.
+[* orange] From the daughterboard side, insert the new probe harness with the small plug (probe side) going in first. With the loom still expanded, you should be able to get it completely through.
[* green] Leave about 1-1.5 inches of the tail end of the probe harness exposed next to the ribbon cable connection and reattach the daughterboard cover.