crwdns2933423:0crwdne2933423:0

crwdns2933803:02crwdne2933803:0

crwdns2933797:0Charlotte Prattcrwdnd2933797:0crwdne2933797:0

crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 Charlotte Pratt

crwdns2933769:0crwdne2933769:0
crwdns2933771:0crwdne2933771:0
crwdns2933801:0crwdne2933801:0

crwdns2933807:0crwdne2933807:0

+[title] Marking the Pipes
+[* red] Obtain the pipe bushing
+[* orange] Mark the 2 in pipe with lines, making the first one at about 1.75 in from bottom to make space for the pipe bushing. Then, mark out 2.5 ft from the bottom of the foot valve for the soil moisture sensor hole. From the 1.75 in line, mark 3 lines 1.5 in apart, then make a 2 in space. Repeat until you reach the 2.5 ft mark
+[* yellow] Obtain the 1.5 in pipe and line up next to the wider pipe from the bottom. Mark a line on the thinner pipe at about 1 in above the 2.5 ft line to mark where the thinner pipe needs to be cut

crwdns2933777:01crwdne2933777:0

crwdns2933779:0crwdne2933779:0

crwdns2915182:0crwdne2915182:0

crwdns2933777:02crwdne2933777:0

crwdns2933779:0crwdne2933779:0

crwdns2915182:0crwdne2915182:0