crwdns2933803:032crwdne2933803:0
crwdns2933797:0Prof. Mayhemcrwdnd2933797:0crwdne2933797:0
crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 Prof. Mayhem
- crwdns2933769:0crwdne2933769:0
- crwdns2933771:0crwdne2933771:0
- crwdns2933801:0crwdne2933801:0
crwdns2933807:0crwdne2933807:0
+ | [title] Reinstall the Cleaner Head |
---|---|
+ | [* black] Slide the Cleaner Head pivot points back over their pivots. |
+ | [* black] Reinstall the plastic washers (Cleaner Head Pivot Circlips) over the pivots. |
+ | [* black] Reinstall the Bearing Clips onto the pivots and seat the ends back into the recesses for them. |
+ | [* black] Reinstall the Hose Assembly into the base of the duct. |
+ | [* black] Reconnect the flexible hose for the beater bar to the port plate. |
+ | [* black] Reinstall the sole plate that was removed in step 18. |