crwdns2944351:0crwdnd2944351:0Depth Sensor Node Bridge Mounted Replacement Procedurecrwdnd2944351:0crwdne2944351:0
crwdns2933797:0Patrick Fegancrwdnd2933797:0crwdne2933797:0
crwdns2936043:0crwdne2936043:0 crwdns2933505:0crwdne2933505:0 Brooke Mason
- crwdns2933769:0crwdne2933769:0
- crwdns2933771:0crwdne2933771:0
- crwdns2933801:0crwdne2933801:0
crwdns2943215:0crwdne2943215:0
- 3/4" Wrench x1 added.
- 3/8" Wrench x1 added.
- Socket Set x1 Can use a socket or (adjustable) wrench added.
- Tape Measure x1 Bringing a weight and means to attach it the tape measure can be useful for the sensor to river bed measurement added.