crwdns2933423:0crwdne2933423:0

Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement

crwdns2911024:0crwdne2911024:0
crwdns2911026:0crwdne2911026:0

crwdns2942213:0crwdne2942213:0

  1. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement, SPM Vent Kit: crwdns2935265:01crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Loosen but do not remove the(4) 8-32 X 3 screws on the outer air intake.

  2. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:02crwdnd2935265:01crwdnd2935265:02crwdne2935265:0 Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:02crwdnd2935265:02crwdnd2935265:02crwdne2935265:0
    • Loosen and remove the (2) 10-32 Keps nuts and the (4) 6-32 X 2 screws. Remove the back case by lifting from the ventilator.

  3. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:03crwdnd2935265:01crwdnd2935265:02crwdne2935265:0 Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:03crwdnd2935265:02crwdnd2935265:02crwdne2935265:0
    • Remove the (2) 4-40 X ¼ screws on the Dovetail Mounting Bracket and disconnect the ribbon cable on the PIM PCB by simultaneously applying pressure on the two locking “ears”.

  4. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:04crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Flip the ventilator over and remove the front case assembly by lifting it straight up away from the ventilator module.

  5. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:05crwdnd2935265:01crwdnd2935265:03crwdne2935265:0 Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:05crwdnd2935265:02crwdnd2935265:03crwdne2935265:0 Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:05crwdnd2935265:03crwdnd2935265:03crwdne2935265:0
    • Remove the battery compartment cover by unscrewing the (4) 6-32 X 5/16 screws.

  6. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:06crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Remove the battery by unscrewing the (4) 6-32 X 2 ¼ screws and detaching the plug from its lockinglatch.

  7. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:07crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Unscrew the (4) 6-32 X 5/16 Phillips screws to remove the damaged battery compartment case.

  8. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:08crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Loosen and remove the (2) 4-40 X 1 ¼ Screws and nylon spacers supporting the Power Input assembly unto the chassis

  9. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:09crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Loosen and remove the (2) 6-32 X ¼ screws holding the chassis to the dovetail mounting bracket and remove the SPO2 insulator. Loosen and remove the (2) 8-32 X ¼ screws holding the chassis to the vent module

  10. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:010crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Insert screwdriver through the holes on the chassis to loosen and remove the (2) 6-32 x 5/16 screws holding the chassis to the vent module.

  11. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:011crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Lift the damaged chassis from the ventilator module.

  12. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:012crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Disconnect the Power Input cable from the PIM PCB by pressing on the locking latch and pulling the cable straight up from the connector.

  13. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:013crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Remove the PIM PCB by loosening the (5) 4-40 X 5/16 screws.

  14. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:014crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Remove the Dovetail stabilizer bracket by loosening and removing the (2) 6-32 x ¼ and the (2) 4-40 X ¼ screws.

  15. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:015crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Install the dovetail stabilizer bracket ontothe new SPM assembly by tightening the (2) 6-32 X ¼ and (2) 4-40 X ¼ screws.

  16. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:016crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Secure the PIM Board to the new SPM with the (5) 4-40 x 5/16 screws.

  17. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:017crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Secure the chassis to the vent module using the (2) 6-32 X ¼ screws with SPO2 insulator, the (2) 8-32 X ¼ and the (2) 6-32 x 5/16 screws.

  18. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:018crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Secure the Power Input assembly to the Chassis using the (2) spacers and (2) 4-40 X 1 ¼ screws. Do not over-tighten the screws.

  19. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:019crwdnd2935265:01crwdnd2935265:02crwdne2935265:0 Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:019crwdnd2935265:02crwdnd2935265:02crwdne2935265:0
    • Rotate battery compartment to mate with upper and lower case cutouts and press firmly into place. Secure with (4) 6-32 X 5/16 screws provided

  20. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:020crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Re-assemble the battery by connecting its cable to the connector (pull on cable to insure it is locked in place) then tightening the (4) 6-32 X 2 ¼ screws.

  21. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:021crwdnd2935265:01crwdnd2935265:03crwdne2935265:0 Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:021crwdnd2935265:02crwdnd2935265:03crwdne2935265:0 Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:021crwdnd2935265:03crwdnd2935265:03crwdne2935265:0
    • Re-assemble the battery compartment cover by tightening the (4) 6-32 X 5/16 screws.

  22. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:022crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Place the front case assembly over the vent module and tighten the (2) 4-40 X ¼ screws unto the dovetail mounting bracket. Reconnect the ribbon cable unto the PIM PCB. Make sure the two locking “ears” lock into position.

  23. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:023crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Attach the back case to the vent module and align cover with handle, air intake housing and dovetail mounting studs. Insert and tighten the included (2) 10-32 Keps nuts and the (4) 6-32 X 2” screws.

  24. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:024crwdnd2935265:01crwdnd2935265:02crwdne2935265:0 Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:024crwdnd2935265:02crwdnd2935265:02crwdne2935265:0
    • Tighten the (4) 8-32 X 3 screws on the outer air intake.

  25. Zoll Impact Uni-Vent 731 SPM Vent Kit Replacement: crwdns2935265:025crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Perform HiPot Testing then perform Calibration and Functional Test using the RCS.

crwdns2915888:0crwdne2915888:0

To reassemble your device, follow these instructions in reverse order.

crwdns2935227:0crwdne2935227:0

Brandon Drury

crwdns2935283:005/04/20crwdne2935283:0

391 crwdns2915208:0crwdne2915208:0

crwdns2935295:0crwdne2935295:0

crwdns2915084:0crwdne2915084:0

Cal Poly, Team S1-G5, Zimmerman Spring 2020 crwdns2935289:0Cal Poly, Team S1-G5, Zimmerman Spring 2020crwdne2935289:0

CPSU-ZIMMERMAN-S20S1G5

crwdns2931471:05crwdne2931471:0

crwdns2935297:05crwdne2935297:0

crwdns2947410:01crwdne2947410:0

Hi

What is the service passcode to reset the PM clock?

fayezhmc - crwdns2934203:0crwdne2934203:0

crwdns2917038:0crwdne2917038:0

crwdns2936625:0crwdne2936625:0:

crwdns2936751:024crwdne2936751:0 0

crwdns2936753:07crwdne2936753:0 0

crwdns2936753:030crwdne2936753:0 4

crwdns2942667:0crwdne2942667:0 382