crwdns2933423:0crwdne2933423:0

How to Perform Circuit Service on the Newport HT70

crwdns2911024:0crwdne2911024:0
crwdns2911026:0crwdne2911026:0
  1. How to Perform Circuit Service on the Newport HT70, Setup: crwdns2935265:01crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Connect the breathing circuit to the main flow outlet, or as if it were being used for a patient.

    • Cover up the breathing circuit (do not use test lung) .

  2. How to Perform Circuit Service on the Newport HT70, Begin Test: crwdns2935265:02crwdnd2935265:01crwdnd2935265:01crwdne2935265:0
    • Touch the Circuit Check button at the top of the screen.

    • Press ‘Accept’.

    • Uncover the end of the patient circuit pictured in Step 1.

    • Press the ‘Accept’ button to continue with the circuit check.

    • If test passes, the message “Circuit Check PASSED press accept to confirm” will appear on the screen.

    • If the Circuit check does not pass, do not use the ventilator for patient use. Use an alternate Method of ventilation.

    • If the Circuit Check has failed, there may be an issue with the pump assembly, refer to the “Pump Assembly Replacement” guide to proceed with this diagnosis.

crwdns2915888:0crwdne2915888:0

To reassemble your device, follow these instructions in reverse order.

Merek McGill

crwdns2935283:004/07/20crwdne2935283:0

520 crwdns2915208:0crwdne2915208:0

crwdns2935297:05crwdne2935297:0

crwdns2915084:0crwdne2915084:0

Cal Poly, Team S7-G5, Paton Spring 2020 crwdns2935289:0Cal Poly, Team S7-G5, Paton Spring 2020crwdne2935289:0

CPSU-PATON-S20S7G5

crwdns2931471:03crwdne2931471:0

crwdns2935297:06crwdne2935297:0

crwdns2944067:00crwdne2944067:0

crwdns2917038:0crwdne2917038:0

crwdns2936625:0crwdne2936625:0:

crwdns2936751:024crwdne2936751:0 0

crwdns2936753:07crwdne2936753:0 2

crwdns2936753:030crwdne2936753:0 5

crwdns2942667:0crwdne2942667:0 322